GEOSCAPE Chevron Nigeria
October 12, 2017
In October 2017 Generon IGS was awarded the third repeat order from Chevron Nigeria for the supply of a containerized nitrogen membrane system. The system with a flow capacity of 30,000 SCFM at 98 % Nitrogen will be used to supply inert gas at Chevron’s Gas to Liquid facility at the Escravos Site, Delta State, Nigeria
Back in 2011 Generon had commissioned the first unit with the same capacity which performed to Chevron’s full expectations.
Click here to learn about GENERON® Containerized Nitrogen Units, or contact us for more information.